top of page



How to Read a Construction Schedule and Spot the Optimism
How to read a construction schedule: critical path, float and baseline, where optimism hides, and the five questions to ask at every review.
Carolee Turner
Sep 134 min read


The Design-Build Schedule: How Much Faster Is It Really, and Where Does the Time Come From?
Research puts design-build well ahead of design-bid-build on delivery speed. Here is exactly where the time comes from, what you trade for it, and when design-build is not faster at all.
Carolee Turner
Sep 135 min read
bottom of page